A turnkey process built around how hotels actually run — including the guests still checked in while we work.

Five steps, one team

Timings are typical for a 150–250 key hotel. Smaller projects move faster; we’ll give you a schedule after the survey.

  1. Consultation & site surveyWeek 1

    We visit the property, take laser measurements and review your architectural drawings.

    • Measurements for every window type
    • Swatch presentation for design and procurement teams
    • Budget and specification options
  2. Mock-up roomWeeks 2–4

    We make and install a complete sample guestroom before anything is ordered in bulk.

    • Management inspection and sign-off
    • Light-leak testing at night
    • Housekeeping tries take-down and re-hanging
  3. Precision fabricationWeeks 4–8

    Fabrics are woven or pulled from stock, then cut, pleated and finished at our facility.

    • Custom pleating and weighted hems
    • Every panel labelled by room and window
    • Quality checks on stitching and size
  4. Phased installationWeeks 8–12

    Our own crews install floor by floor, scheduled around your occupancy.

    • No disruption to guests in occupied floors
    • Motor programming and GRMS testing
    • Final steam-press and handover
  5. Aftercare & AMCOngoing

    We stay on after handover with warranties, spares and annual maintenance.

    • Warranty on tracks and motors
    • Fast spare parts
    • Annual motor calibration and track servicing

Start with a site survey.

We’ll measure, show you swatches and give you a clear proposal with timings.